Anyone using ControlMap for CMMC readiness and/or assessment?
What I’m most curious about are any customizations you’ve made to the tenant along the way. I’ve found myself creating lots of custom tags based on the documentation, figuring out the best way to track different scopes within the same org/CAGE code/tenant, and making sure any CM docs line up with the official documentation.
I have a good grasp on the standard and attestation themselves, so I’d be interested in comparing notes with anyone going through all of this with CM as their platform.